Staff at several stations are discovering to their alarm that Connect equipment has mysteriously appeared on their station. At Seven Sisters, AC condenser units on platform 3; at Elephant & Castle, kit with hydrogen-producing batteries in two of the station's rooms.
Naturally, staff have valid safety concerns about this equipment. Safety reps need to be forcefully on the case, ensuring that Connect and LUL have established the correct permissions (unlike at Seven Sisters!), and that they are properly consulted before the equipment is installed.
Tubeworker topics